Documents

30 views

LEED Semi Blank Sheet

Credit Number Credit Name LEED New Construction v.2.2 semi BLANK Study Guide Intent and Implementation Code or Standards Sustainable Sites Extra Credit Sub. Phase SSP1 SS1 SS2 SS3 SS4.1 Construction Activity Pollution Prevention 1 - EPA 2003 2 - NPDES X construction 1 - USDA Site Selection 2 - FEMA 3 - CFR 4 - Clean Water Act X Density Development & Community Connectivity n/a X design Brownfield Redevelopment 1 - ASTM E1903-97 2 - EPA Brownfield Definition 3 - local codes X Alt
of 13

Please download to get full document.

View again

All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Share
Tags
Transcript
  Credit NumberCredit NameIntent and ImplementationCode or StandardsExtra CreditSub. Phase SSP1 ConstructionActivityPollutionPrevention 1 - EPA 20032 - NPDESX construction SS1 Site Selection 1 - USDA2 - FEMA3 - CFR4 - Clean Water ActX SS2 DensityDevelopment &CommunityConnectivity n/aX SS3 Brownfield Re-development 1 - ASTM E1903-972 - EPA Brownfield Definition3 - local codesX SS4.1 AlternativeTrans. - PublicTransportationAccess n/aTrans. mgmt. planshowing quantifiable autoreduction design LEED New Construction v.2.2 semi  BLANK Study Guide Sustainable Sites 1http://www.intheleed.com  Credit NumberCredit NameIntent and ImplementationCode or StandardsExtra CreditSub. Phase SS4.2 AlternativeTrans. - BikeStorage &ChangingRooms n/aTrans. mgmt. planshowing quantifiable autoreduction SS4.3 AlternativeTrans. - Low-E& Fuel Eff.Vehicles 1 - California Air ResourcesBoard Zero Emission Vehicles(ZEV)2 - Amer. Council for anEnergy Eff. Economy (ACEEE)Trans. mgmt. planshowing quantifiable autoreduction SS4.4 AlternativeTrans. - ParkingCapacity n/aTrans. mgmt. planshowing quantifiable autoreduction SS5.1 SiteDevelopment -Protect or Restore Habitat n/a75% Green construction SS5.2 SiteDevelopment -Maximize OpenSpace n/aCase 1: exceed local by50%Case 2: double bldg.footprintCase 3: 40% of site areaopen designdesign 2http://www.intheleed.com  Credit NumberCredit NameIntent and ImplementationCode or StandardsExtra CreditSub. Phase SS6.1 Stormwater Design -QuantityControl n/aX design SS6.2 Stormwater Design - QualityControl Coastal Waters 1993X design SS7.1 Heat IslandEffect - Non-Roof  n/aOption 1: 100% shadeOption 2: 100% coveredparking construction SS7.2 Heat IslandEffect -Roof  ASTM E1980-01100% green roof  design SS8 Light PollutionReduction ASHRAE/IESNA 90.1 - 2004X design 3http://www.intheleed.com  Credit NumberCredit NameIntent and ImplementationCode or StandardsExtra CreditSub. Phase WE1.1  Water EfficientLandscaping -Reduce by 50% n/aX WE1.2  Water EfficientLandscaping -No Potable Water Use or No Irrigation n/aX WE2 Innovative Wastewater Technologies n/aReduceortreat 100% WE3.1  Water UseReduction - 20% WE3.2  Water UseReduction - 30% Water Efficiency All Design 40% Reductionor10% Saving $Enery Policy Act 1992 (EPAct) 4http://www.intheleed.com
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks